Looking down at the new platforms in 2015 under construction from the Arthur Kill Road bridge
Looking down on the new side platforms under construction at Arthur Kill
The new platforms viewed from Ellis Street
Looking through a gate to the under-construction station
Exit signs, Hard Hats, Safety Glass, Safety Shoes Required Beyond This Point. next to the Improving, non-stop sign for Constructing a new Arthur Kill station.
Looking through fencing at a passing R44 train through the station under construction
Looking past fencing at the station under construction
Looking at the blur of a train passing through the new station under construction
Construction of the platforms under construction
Looking through fencing at the station platforms
Looking past a port-a-john at the station platforms under construction
The ramp entrance from Ellis Street to the station
The ADA sign for Arthur Kill Ramp to Tottenville or St. George
The small grassy plaza with some new trees At the Ellis Street entrance
Heading up the ramp to the Tottenville-bound platform and the pedestrian bridge
The only entrance area to the Tottenville platform, with a mixture of normal subway, Do not enter or cross tracks, and the different format SIR sign that says the same thing
Looking down on the entrance area from above and sign for the Exit to Ellis Street
Signs for the Exit to Ellis Street, or the Exit To St George, Arthur Kill Road and S74 bus transfer
An Arthur Kill sign just beyond the platform canopy with glass blocks!