Across from the recently opened entrance through the Corbin building, and the nearing completion Fulton Center construction site
Across from the Corbin building, still paper in the windows, and plenty of work to finish, a passageway is now open through it
Doors in the nearly completion main Fulton Center building
A set of recently installed no open yet doors into Fulton Center, taped arrows direct passengers one block south to John Street where the one open entrance is
The soon to open entrance doors from the SE corner of Fulton St and Broadway, one door is ajar revealing a Porta-Potty inside
Newly installed glass with Subway etched into it
Glass leading out to Broadway with taped over windows of the nearly completed Fulton Transit Center
Doors into the Fulton Transit Center have been installed, eventually these will be extremely heavily used by commuters
Taped over doors at the nearly completed Fulton Center
Looking across Broadway at the Fulton Center and Corbin Building, exterior work has been completed, no more scaffolding
The very narrow corbin building, and new secondary building that provides elevators and stairs to service and make useful this historic office building that was preserved by the MTA through Fulton Transit Center construction
Glass doors covered up with White and a sign that says Fulton Center Opening Soon on the A/C mezzanine
Air ducts above a passageway through the Fulton Center to maintain the transfer between A/C and Uptown & Bronx 2/3 trains and a place for passengers to enter the subway system
Signs for A/C/J/Z/2/3 in one direction, and Uptown 4/5 in the opposite on a construction wall, white sheeting above tries to hide views into the atrium as Fulton Center is 2 months from opening
Looking up a wide staircase still with some construction walls and the doors out to 4/5 trains
Stairs lead up to the street through the atrium nearing completion and the doors up to the SE corner of Fulton St & Broadway
Looking through a gap in the sheeting and construction walls at what will be the Concourse level from the lower-level
Looking down to the subway entrance from Fulton St and Broadway, past not open yet escalators, leading down to a white construction wall and large sheets of white fabric that surround the multi-level construction site
On the open entrance stairs, the token booth and subway entrance is modern and visible, with lots of white sheeting and construction walls all around as the Fulton Center nears completion