South Station
 
Home<Boston MBTA<Commuter Rail<Framingham/Worchester Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Needham Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Franklin Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Providence/Stoughton Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Fairmount Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Greenbush Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Middleborough/Lakeville Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Kingston/Plymouth Line<South Station<Photos Page 3
Home<Amtrak<Boston-South Station, MA<Photos Page 3
Home<Boston<CapeFLYER<Boston-South Station, MA<Photos Page 3
Page 1|Page 2|Page 3|Page 4
southsta41
An Acela train with Locomotive #2013 has overnighted in the station on a Sunday morning
11 August, 2013
southsta42
Acela Power Car #2016 and P42 #107 that has led the just arrived 'Night Owl' Northeast Regional into the station
11 August, 2013
southsta43
The Departures board, the next train is the 8:00am CapeFlyer to Hyannis, MA, its simply listed as an MBTA train (it uses its equipment) although the CCRTA is the main operator
11 August, 2013
southsta44
P42 #107 that has just led Train #66 plus the back of an Amfleet (that I assume will be the 8:40 Regional and daytime trip to Newport News)
11 August, 2013
southsta45
P42 #107, Train #66 has arrived with two P42s fallowed by two AEM7s vastly overpowering a short 5 car train
11 August, 2013
southsta46
Sign at Track 11 (nothing to special) for the Cape Flyer, only the two stops that allow passengers to discharge are listed, Buzzards Bay, Ma and Hyannis, MA. Commuter trains don't include states. The train also stops to receive passengers at Braintree and Middleborough
11 August, 2013
southsta47
Two P42s are attached to two HHP8 on the unusual consist for Train #66
11 August, 2013
southsta48
AEM7 #916 attached to a P42
11 August, 2013
southsta49
F40PHM #1030 that will be the trailing locomotive of Today's CapeFlyer
11 August, 2013
southsta50
The two AEM7s of the CapeFlyer
11 August, 2013
southsta51
The rear AEM7s (and two P42s ahead of it) attached to the last Amfleet of Train #66
11 August, 2013
southsta52
A BiLevel Coach and Comet BTC-1C #224, the CapeFlyer wrapped car that includes a cold concession counter, bike racks and a few seats will be the first car of today's Hyannis-bound train
11 August, 2013
southsta53
The Boston to Cape Cod wrap, it looks like the beach and ads dot the artwork below it
11 August, 2013
southsta54
The CapeFlyer Car under the south station garage
11 August, 2013
southsta55
HHP-8 #653 and a MBTA Commuter Rail Locomotive at the southern end of the platforms
11 August, 2013
southsta56
Baggage Carts and the CapeFlyer wrapped car. The only place on the train with the logo
11 August, 2013
southsta57
Ex-UTA MP36PH-3C #10 will lead today's CapeFlyer that also has a locomotive at its other end for pull-pull operations
11 August, 2013
southsta58
x-UTA MP36PH-3C #10 will soon leave South Station for Cape Cod
11 August, 2013
southsta59
The silver sides of the bus station that is above the southern ends of the platforms
11 August, 2013
southsta60
The Train Information Board at the heart of Rush Hour, 17 trains departing in one hour, two Amtrak, the rest Commuter Rail
11 August, 2013
Page 1|Page 2|Page 3|Page 4
Home<Boston<CapeFLYER<Boston-South Station, MA<Photos Page 3
Home<Boston MBTA<Commuter Rail<Framingham/Worchester Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Needham Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Franklin Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Providence/Stoughton Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Fairmount Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Greenbush Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Middleborough/Lakeville Line<South Station<Photos Page 3
Home<Boston MBTA<Commuter Rail<Kingston/Plymouth Line<South Station<Photos Page 3
Home<Amtrak<Boston-South Station, MA<Photos Page 3
MBTA Gommuter Rail on the SubwayNut

Last Updated: 12 August, 2013
This website is not affiliated with the Massachusetts Bay Transportation Authority. Their official website is here
This Website is maintained and copyright © 2011, Jeremiah Cox. Please do not remote link images or copy them from this website without permission.