Wickford Junction
 
Home<Boston MBTA<Commuter Rail<Providence/Stoughton Line<Wickford Junction<Photos Page 2
Page 1|Page 2|Page 3
wickford_jct21
The ramp second entrance to the second level of the parking garage requires a gradual ramp at the northern end of the platform
wickford_jct22
CTC-3 #1523 has just arrived in pull mode and will lead the next train in push mode back to Boston
wickford_jct23
The northern end of the platform beyond the range of a stopped train
wickford_jct24
wickford_jct25
The northern brick wall of the garage, fewer windows
wickford_jct26
wickford_jct27
wickford_jct28
A Blue Emergency pillar on the platform
wickford_jct29
An Amtrak Hi-Railer goes down the NEC
wickford_jct30
wickford_jct31
wickford_jct32
Side view of GP40MC #1136
wickford_jct33
Looking down on the station drop off loop (and short term parking spaces) the US flag and Rhode Island flag wave
wickford_jct34
The drop-off plaza and elevator tower of the parking garage
wickford_jct35
wickford_jct36
GP40MC #1136 stopped at the southern end of the platform
wickford_jct37
This ramp at the end of the platform loops around to the drop-off area
wickford_jct38
Looking up the ramp towards the canopy to GP40MC #1136 stopped on the platform
wickford_jct39
GP40MC #1136
wickford_jct40
Page 1|Page 2|Page 3
Home<Boston MBTA<Commuter Rail<Providence/Stoughton Line<Wickford Junction<Photos Page 2
MBTA Gommuter Rail on the SubwayNut

Last Updated: 22 September, 2013
This website is not affiliated with the Massachusetts Bay Transportation Authority. Their official website is here
This Website is maintained and copyright © 2011, Jeremiah Cox. Please do not remote link images or copy them from this website without permission.