View out from the secondary eastern pedestrian bridge above the platforms and to the main ticket hall and waiting room on the opposite pedestrian bridge
Elevator or stairs to Track 4
Stairs to Track 2 and 4 and plywood closing off the rest of the secondary pedestrian bridge
Top of the up only esclator to the secondary bridge
The narrow staircase off the pedestrian bridge
The narrow eastern pedestrian bridge that has escalators down to all platforms
Across from the elevator from Track 4 to the Western pedestrian bridge
Approaching the station through the Stamford Gateway CT Transit bus loop beneath I-95
Walking into the station from the Stamford Gateway CT Transit bus station
The transfer: Northeast Regional Train #170 with the final destination of Boston, across from short Springfield Shuttle Train #470 for Inland route passengers
The tunnel to the platforms from the Gateway entrance
The overpass corridor directly outside the station's main elevated waiting area and Acela and Metro-North ticket offices
Inside the main waiting area with the ticket offices
Beneath the secondary pedestrian overpass to the main garage
Passengers wait for the next one stop (125th Street) express train to Grand Central